Aussenkehr Settler

Two Lamella Tube settlers specifically designed for Namwater to treat 66m³/h incoming flow in an upflow pattern. Fully fabricated in house from Stainless Steel, transported to site as abnormal load and assembled on site in Aussenkehr.

Client: Namwater

Process Engineer: Aquarius Consult

Structural / Mechanical Engineer: Metallum Fabrication in partnership with Axis Mechanical Design

Material: 304 Stainless Steel

Dimensions: 9m Long x 4.5m High x 2.8m Wide

Treatment Flow Rate: 66 m³/h